Rehabilitation and Upgradation of Public Private Partnership in Madhya Pradesh Road Sector Project (PPPMPRSP) Package No.-46 Harrai-Chindikhapa-Bijouri Road
Whether you're a government entity seeking a reliable highway construction partner or a community looking to enhance connectivity, Harrai Bijouri Highway Pvt. Ltd. is your trusted ally on the road to progress.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
a.
b.
c.
d.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
Client
Concessionaire
EPC Contractor
Independent Engineer
Bid Project Cost
Mode (HAM)
Agreement Letter No.
Letter of Acceptance No.
Appointed Date
Date of Completion
PMS-1 (Shedule/Actual)- 120 Days
PMS-2 (Shedule/Actual)- 365 Days
PMS-3 (Shedule/Actual)- 545 Days
Completion (Shedule/Actual)- 730 Days
Forest Area
Total Design length
Two lane with Earthen shoulders
Two lane with paved shoulders
Two lane with Earthen & CC shoulders
Two lane with CC shoulders
Four lane
Intermediate and two lane with CC & Earthen shoulder
Major Junctions
Minor Junctions
Metal Beam Crash Barrier
Total Main Villages
Flexible Pavement
BC :
DBM :
WMM :
GSB :
Sub Grade :
Rigid Pavement
PQC :
DLC :
GSB :
Sub Grade :
Paver block flooring (M-35)
PCC Road Side Drainage
LHS :
RHS :
M P Road Development Corporation Limited
M/S Harrai Bijouri Highways Private Limited
M/s Udit Infra World Pvt Ltd.
M/s Aarvee Associates Consultants Pvt Ltd.
Rs:- 173,45,56,500/-
Hybrid Annuity Mode
720/2022,16th June,2022(16.06.2022)
3126/MPRDC/Procu/PPPMPRSP/5 Pkgs/526/2021 dated 17.05.2022
03.12.2022
01.12.2024
01.04.2023
02.12.2023
30.06.2024
01.12.2024
7.280 Km
72.731 km
61.550 km (TCS-01) Flexible pavement
0.400 km (TCS-02) Rigid pavement
6.990 km (TCS-03) Flexible pavement
0.220 km (TCS-04) Flexible pavement
3.031 km (TCS-05) Rigid pavement
0.540 km (TCS-06) Flexible pavement
03 nos (0+000 NH-547,0+869 NH-574 & 72+731 SH-19)
39 nos
18.18 Km
19 nos
2 Lane- 69.300 Km
40 mm
60 mm
250 mm
230 mm
500 mm
04 Lane- 3.031 Km & 2 Lane- 0.400n Km
280 mm
150 mm
150 mm
500 mm
3.339 Km BHS at PQC Shoulder
14.832 Km
5.841 km
8.991 km
27.
28.
.
.
.
.
.
.
.
.
29.
.
.
.
.
30.
.
.
31.
.
.
.
.
.
.
.
.
.
32.
.
.
33.
34.
35.
Reconstruction as Major Bridge
Reconstruction as Minor Bridge (17 no)
.
.
.
.
.
.
.
.
Hume Pipe Culverts (HPC 1.2 mm Dia/199 no)
Reconstruction :
New Proposed :
Minor Junctions :
Agriculture Utilities pipe duct 300 mm dia :
Reconstruction as RCC Slab Culverts (28 no)
Road side Furniture :-
Overhead Gantry :
Road signs :
Road Markings :
Road side & Median Safety Barriers :
Reflecrive Pavement Markers (Road Studs) :
Road delineators :
Pedestrian Facilities :
Road Boundary pillar :
Kilometer and Hectometer stones :
Compulsory Afforestation :-
Compulsory Afforestation of trees :
Utilities shifting :
W-Beam metal crash barriers :
Retaining wall
Bus bye & Bus Shelter
1 no (7×12)
17 nos
2 nos (4×12)
2 nos (3×12)
4 nos (2×12)
1 no (3×10)
1 no (2×10)
1 no (1×10)
1 no (2×8)
5 nos (1×8)
127 nos
33 nos
39 nos
150 nos (IRC :98-2011)
15 nos (1×6)
8 nos (1×4)
5 nos (1×3)
.
3 nos
751 nos
28430 Sqm
18.18 km length
21162 nos
924 nos
as per clause 9.8 of the manual
718 nos (IRC :25-1967)
as per clause 12.3 of the manual
.
14708 nos
as per site
18.18 km length
0.540 km
43 nos